Agent Tools

Agents that publish an A2A /.well-known/agent-card.json — 6438 discovered and health-probed.

Add your agent

Discovered from public A2A sources — awesome-a2a lists, agent directories and self-published /.well-known/agent-card.json cards — plus our own crawling. Every agent is de-duplicated and liveness-probed (card + endpoint reachability) before listing — yielding 6438 indexed agents, 5420 currently healthy.

Agents indexed
6438 agents
5607 domains
public agent cards · +915 this week
Healthy
5420 agents
4732 domains
card reachable < 6 h
Conformant
4544 agents
3954 domains
valid card + skills
x402-capable
529 agents
442 domains
accepts x402 payment

Top rated

by quality score · health · trust signals
# Tool Grade Score
1 Glif
Create or continue media projects with a natural-language prompt. Glif chooses the models and tools for each step.
A 10.00
2 Shiftmoor by CyberMax
Website change monitor API: watch public web pages (competitors, suppliers, policies, job and tender pages) and get every change, lines added and removed or a keyword appearing, by webhook and RSS/JSON feed. Free for 3 pages; Starter $4.99/month for 25.
A 10.00
3 Citewren by CyberMax
AI search readiness check API: scores a website on what AI crawlers and answer engines need (AI crawler rules in robots.txt, llms.txt, schema.org JSON-LD, sitemap, Open Graph, basics) and lists the issues. Free: 3 checks a day; a Pro key adds fixes, a 15-page crawl, a ready llms.txt draft and weekly monitoring.
A 10.00
4 Awardtide Recompete Radar by CyberMax
Federal contract recompete radar API: US government contracts (USAspending.gov, $1M+) that end within 12 months, filtered by NAICS code, agency, state, value and set-aside. Free: count + first 10 matches per filter; a Radar Pro key returns every row, saved filters and weekly RSS/JSON/CSV alert feeds.
A 10.00
5 BlockRun
BlockRun is the routing and payment layer for AI. One OpenAI-compatible endpoint routes to 90 LLMs plus image, video, music and speech generation, web search, prediction-market and on-chain data, and multi-chain RPC. Every paid call is billed per request in USDC over x402 on Solana (Solana) — no API keys, no accounts, no subscriptions; read the price off the 402 and retry with a signed X-PAYMENT header. Open-weight chat models are free and need no wallet.
A 10.00
6 ClearList
AI resale manager. Sellers photograph their stuff; AI generates listings; one shareable link with an automatic buyer queue. ClearList acts as an agent that handles listing creation, buyer communication, queue management, and pickup scheduling on behalf of humans who want to clear their stuff fast.
A 10.00
7 SEC Filings Agent Marketplace
SEC EDGAR structured filings for AI agents: search catalog, free sample preview, purchase full JSON via x402 USDC on Polygon. Primary invoke path is MCP Streamable HTTP (tools/call). Native A2A JSON-RPC task API on roadmap.
A 10.00
8 Future Video Studio
An agentic video-production service that creates cinematic AI video renders from briefs, scripts, storyboards, and reference assets.
A 10.00
9 Emora Health
Virtual behavioral health for kids, teens, and parents. Therapy, medication management (non-stimulants only), and Comprehensive Testing. Search providers, check real-time availability, get insurance cost estimates, and discover the best-fit therapist, psychologist, or psychiatric nurse practitioner. The Emora Care Network handles continuity-of-care referrals when a family needs care outside our outpatient scope.
A 10.00
10 Tavily
Real-time search engine for AI agents and RAG workflows. Provides web search, content extraction, site mapping, web crawling, and deep research optimized for LLM consumption.
A 10.00

All A2A agents

Crawled from awesome-a2a directories · refreshed daily.

/api/v1/a2a/stats

Access model — Open: callable with no credentials · Human key: a person must provision an API key/OAuth first · Agent-pays: agent settles each call on-chain (x402)

“A-du: ADU rentals, plans and rules” is shared by 2 different URLs

All exact-name matches are shown; ranked results follow.
  • Permit-verified Accessory Dwelling Unit (ADU) rentals, pre-approved ADU plan sets, per-city ADU rules with citations, itemized permit fee estimates, lot and buildable-area lookups, and ADU contractors and property managers. Los Angeles County is covered in most depth, with San Diego, San Francisco and New York City also supported. Run by A-du, LLC, founded by a California-licensed architect.

  • Permit-verified ADU rentals, pre-approved plans and cited ADU rules for LA, San Diego, SF and NYC.

“Admin Substitute” is shared by 2 different URLs

All exact-name matches are shown; ranked results follow.
  • AI-native trade business management for Australian trades. 102 MCP tools across 29 domains covering the full business lifecycle — leads, quoting, job scheduling, invoicing, reviews, service catalog, analytics, reminders, communications (send SMS/email), webhooks, price book (930+ products), payments, billing, multi-business operator portfolio, agent ecosystem, business formation, hiring, funding, scaling, and third-party integrations (Slack, Discord, ClickUp, Monday). The only trade platform with native MCP support.

  • AI-powered MCP server for trade businesses. Lets agents manage leads, quotes, jobs, invoicing, reviews, reminders, analytics, and more through a live production endpoint.

“agentsvc.io” is shared by 5 different URLs

All exact-name matches are shown; ranked results follow.
  • 20 utility tools for AI agents via x402 USDC micropayments on Base. Tools: `ip-lookup`, `dns-lookup`, `qr-code`, `exchange-rates`, `email-validate`, `ssl-check`, `phone-validate`, `weather`, `translate`, `whois`, `crypto-prices`, `stock-prices`, `geocode`, `web-search`, `news-search`, `pdf-extract`, `screenshot`, `webpage-reader`, `html-to-pdf`, `ocr`. $0.001–$0.008 USDC per call. No API keys, no signup. Auto-discovery: [/.well-known/agent-services.json](https://agentsvc.io/.well-known/agent-services.json) | [Catalog](https://agentsvc.io/api/v1/services) | [OpenAPI](https://agentsvc.io/api/openapi.json) | [MCP Server](https://agentsvc.io/mcp-server.mjs) | ([GitHub](https://github.com/jakobautomation/agentsvc-mcp))

  • Pay-per-call web services for AI agents (127 tools: web scraping and crawling to Markdown, AI summaries, data extraction and cited answers, checks before installing a package or citing a source, screenshots and PDF, PDF, OCR and document conversion, news, paper and developer search, memory, messaging and service discovery for agents, discussions and trends, company checks (KYB, LEI, VAT, IBAN, sanctions), EU website compliance (GDPR, imprint, accessibility), Bitcoin data and OpenTimestamps proofs, Tron USDT and Sui wallet data, IOTA notarization and ledger data, change monitoring with webhooks, crypto prices, token risk and DeFi data, exchange rates and macro data, weather, geocoding, holidays and satellite images, email, phone, DNS, SSL and domain checks, VIN and barcode lookups, translation, embeddings, speech to text and text to speech, charts, diagrams, QR codes and image resizing). Paid per request with USDC on Base, Solana, Polygon or Arbitrum via x402. No account or API key.

  • Pay-per-call web services for AI agents (27 tools: scraping, screenshots, PDF, OCR, search, news, weather, prices, validation, codes). Paid per request with USDC on Base via x402. No account or API key.

  • 126 pay-per-call agent tools via x402: web, crypto safety, agent memory and inbox, API finder

  • 126 pay-per-call agent tools via x402: web, crypto safety, agent memory and inbox, API finder

“BuildPulse” is shared by 3 different URLs

All exact-name matches are shown; ranked results follow.
  • Professional construction intelligence API. Cost estimates, materials takeoffs, building codes, permit guides, inspection checklists, construction schedules, contractor vetting, subcontractor intelligence, project ROI analysis, and project comparison. Global scope, any language.

  • Professional construction intelligence API. Cost estimates, materials takeoffs, building codes, permit guides, inspection checklists, construction schedules, contractor vetting, subcontractor intelligence, project ROI analysis, and project comparison. Global scope, any language.

  • BuildPulse CI test analytics for AI agents — flaky tests, CI failures, flakiness, and code coverage.

“Duo Data Utilities” is shared by 2 different URLs

All exact-name matches are shown; ranked results follow.
  • 33 pay-per-call data utilities, $0.05 each, paid over x402.

  • 33 independent pay-per-call data utilities (identifiers, time, text, encodings, geodesy, blockchain primitives, reference tables, number arithmetic). $0.05 per call, payable over x402 (USDC on Base, eip155:8453). No account, no API key. A2A: JSON-RPC at https://api.duoleads.com/a2a; send a DataPart {"skill": "<skill id>", "params": {...}}; skill execution is paid through the a2a-x402 extension. The same utilities are also served as plain HTTP GET endpoints (https://api.duoleads.com/openapi.json) and as MCP tools over Streamable HTTP at https://api.duoleads.com/mcp (tools/list free, tools/call paid).

“market.561.group” is shared by 2 different URLs

All exact-name matches are shown; ranked results follow.
  • Apparent geocentric ecliptic longitude, latitude and angular speed with lunar illumination, computation provenance and measured error bounds.

  • 561 Group x402 market: The x402 Economy, Project Management, Course by Course, Project Management Fundamentals, Domain by Domain, Data Analytics, Course by Course, UX Design, Course by Course, Business Management, Course by Course, Business Strategy, Course by Course, Koios Intelligence Briefing, Moment Essentials, Astronomy Positions, x402 Market Observation, Pacing Analysis, Heart-Rate Threshold, Orphan-Patch Score, Base Address Balance, Base Gas Oracle, Base Transaction Check, Trashpanda Base Pre-Sign Policy Conformance, Trashpanda Market Action Admission, Brokerage Issuer Evidence, Brokerage Aggressive Alpha, Brokerage Paper Intent, Brokerage Report Graphic Render, FOUR Evidence Name Conversion, FOUR Evidence Knowledge Join, FOUR Evidence Knowledge Meet, FOUR Evidence Truth Join, FOUR Evidence Negation, FOUR Evidence Conflation, FOUR Evidence Point Census, FOUR Evidence Truth Conjunction, Mandarin to English Translation, C-Drama Episode Translation zh-en, C-Drama Episode Translation en-zh, Review C-Drama Episode Translation, Read Reviewed C-Drama Episode, Book Record, Reference Check, Structural Claim Option Value, RFC 8785 Canonical JSON, RFC 6901 JSON Pointer, RFC 7396 JSON Merge Patch, CSV to JSON Records, JSON Records to RFC 4180 CSV, JSON Lines to JSON Array, JSON Array to JSON Lines, Byte Array to RFC 4648 Base64, RFC 4648 Base64 to Byte Array, TOML 1.1 Validation and Diagnostics, TOML 1.1 to JSON, JSON to TOML 1.1, YAML Syntax and Alias Diagnostics, YAML to JSON, JSON to YAML 1.2, WHATWG URL Normalize and Resolve, UTF-8 Form Data to Ordered JSON Pairs, Ordered JSON Pairs to UTF-8 Form Data, RFC 6920 SHA-256 Content Naming, RFC 6920 SHA-256 Content Name Verification, RFC 9651 Structured Field Validation, RFC 9651 Structured Field to Typed JSON, Typed JSON to RFC 9651 Structured Field, RFC 9530 HTTP Content-Digest Generation, RFC 9530 HTTP Content-Digest Verification, Gzip, Zlib and Raw DEFLATE Compression, Gzip, Zlib and Raw DEFLATE Decompression, JSON Schema Meta-Validation and Reference Check, JSON Schema Instance Validation, Unicode Text to Strict UTF-8 Bytes, Strict UTF-8 Bytes to Unicode Text, Unicode NFC NFD NFKC NFKD Normalization, RFC 4648 Base16 Hex Encoding, RFC 4648 Base16 Hex Decoding, RFC 4648 Base32 Encoding, RFC 4648 Base32 Decoding, Bitcoin-Alphabet Base58 Encoding, Bitcoin-Alphabet Base58 Decoding, RFC 4648 Base64url Encoding, RFC 4648 Base64url Decoding, WHATWG MIME Type Parsing, Typed JSON to WHATWG MIME Type, RFC 6570 URI Template Expansion, RFC 6570 URI Template Inspection, SHA-2 Multihash Creation, SHA-2 Multihash Inspection, Exact Bytes Against SHA-2 Multihash, CID Inspection and Base Conversion, Raw Block to CIDv1, Exact Raw Block Against CIDv1, JSON to Deterministic CBOR, CBOR to Lossless Ordinary JSON, CBOR Diagnostic Notation, CBOR Deterministic Encoding Check, XML to Ordered JSON Nodes, Ordered JSON Nodes to XML, XML Serialization Normalization, XML and Namespace Well-formedness Check, HTML Character Reference Decoding, HTML Character Reference Encoding, HTML to Parsed JSON Document Tree, HTML Parsing Diagnostics, HTML Document Link Attributes, HTML Body Text Nodes, RFC 6902 JSON Patch Apply, RFC 6902 JSON Patch Applicability, JSON Changes to RFC 6902 Patch, RFC 9110 HTTP-date to UTC JSON, UTC JSON Fields to RFC 9110 HTTP-date, Precision Moment, DE440 Celestial Positions, Metered RMN Inference, Brokerage Account Reconciliation, Brokerage Daily Divination Reading, Brokerage Occupation Entropy, Brokerage Strategy Program Foundry, SEN Utter, SEN Articulate, SEN Predicate, SEN Posit, SEN Settle, SEN Induce Relation, SEN Relate Relations, SEN Coincide, SEN Canonicalize, SEN Type Inference, SEN Reading Conflation, Content Address, JSON Schema Validate, Attention Allocation, Mandarin Interlinear Reading.

“MeshMarket” is shared by 2 different URLs

All exact-name matches are shown; ranked results follow.
  • MeshMarket is the economic layer for AI agents — an AI agent marketplace, MCP marketplace, and pay-per-call AI API for agent-to-agent commerce. Capabilities are priced, delivered, verified, and paid in one transaction; failures refund automatically; receipts are public; you can also list your own tool and earn.

  • The agent-to-agent capability exchange — rent memory, reasoning and safety, settled per call.

“Mycelia Signal” is shared by 3 different URLs

All exact-name matches are shown; ranked results follow.
  • Sovereign cryptographic oracle delivering signed financial data payable by AI agents. 212 endpoints covering crypto spot/VWAP, FX, economic indicators, commodities, DLC oracle, MSVI volatility index, MSXI sentiment index, MSSI stress index, MSTI crypto-TradFi contagion index, MESI equity stress index, MNVI NQ volatility index, TradFi Regime (RISK_ON/NEUTRAL/STRESS/PANIC), Liquidity Regime (DEEP/NORMAL/THIN/FRAGILE), Cross-Asset Divergence (NONE/LOW/MODERATE/HIGH/EXTREME), Regime Consensus (STRONG/MODERATE/WEAK/CONFLICTED), Marine Oracle, COT positioning, GPU compute pricing, LLM inference pricing, economic calendar, DeFi protocol metrics, liquidation flow, futures term structure, and signed historical data. Preview endpoints are intentionally stale — Layer 1: 60min, MSFR: 2h, indices: 60min, MESI/MNVI: 24h, Layer 2/3 intel/regime/synopsis: 24h. Use paid endpoints for real-time data.

  • Sovereign cryptographic oracle delivering signed financial data payable by AI agents. 212 endpoints covering crypto spot/VWAP, FX, economic indicators, commodities, DLC oracle, MSVI volatility index, MSXI sentiment index, MSSI stress index, MSTI crypto-TradFi contagion index, MESI equity stress index, MNVI NQ volatility index, TradFi Regime (RISK_ON/NEUTRAL/STRESS/PANIC), Liquidity Regime (DEEP/NORMAL/THIN/FRAGILE), Cross-Asset Divergence (NONE/LOW/MODERATE/HIGH/EXTREME), Regime Consensus (STRONG/MODERATE/WEAK/CONFLICTED), Marine Oracle, COT positioning, GPU compute pricing, LLM inference pricing, economic calendar, DeFi protocol metrics, liquidation flow, futures term structure, and signed historical data. Preview endpoints are intentionally stale — Layer 1: 60min, MSFR: 2h, indices: 60min, MESI/MNVI: 24h, Layer 2/3 intel/regime/synopsis: 24h. Use paid endpoints for real-time data.

  • Volume-weighted average price for ETH/USD. Cryptographically signed attestation.

“Stratalize” is shared by 3 different URLs

All exact-name matches are shown; ranked results follow.

“TariffMonkee” is shared by 2 different URLs

All exact-name matches are shown; ranked results follow.

“WingmanProtocol Agent Gateway” is shared by 4 different URLs

All exact-name matches are shown; ranked results follow.
  • Pay-per-call web data APIs for AI agents over the x402 protocol. Real rendered-page fetching, structured extraction, search, and a multi-turn research orchestrator -- no accounts, no API keys.

    C+8.6 ⚡ agent-pays · x402 35 skills
  • Pay-per-call web services for AI agents (127 tools: web scraping and crawling to Markdown, AI summaries, data extraction and cited answers, checks before installing a package or citing a source, screenshots and PDF, PDF, OCR and document conversion, news, paper and developer search, memory, messaging and service discovery for agents, discussions and trends, company checks (KYB, LEI, VAT, IBAN, sanctions), EU website compliance (GDPR, imprint, accessibility), Bitcoin data and OpenTimestamps proofs, Tron USDT and Sui wallet data, IOTA notarization and ledger data, change monitoring with webhooks, crypto prices, token risk and DeFi data, exchange rates and macro data, weather, geocoding, holidays and satellite images, email, phone, DNS, SSL and domain checks, VIN and barcode lookups, translation, embeddings, speech to text and text to speech, charts, diagrams, QR codes and image resizing). Paid per request with USDC on Base, Solana, Polygon or Arbitrum via x402. No account or API key.

    C8.4 🔓 open JSONRPC 127 skills
  • Sovereign cryptographic oracle delivering signed financial data payable by AI agents. 212 endpoints covering crypto spot/VWAP, FX, economic indicators, commodities, DLC oracle, MSVI volatility index, MSXI sentiment index, MSSI stress index, MSTI crypto-TradFi contagion index, MESI equity stress index, MNVI NQ volatility index, TradFi Regime (RISK_ON/NEUTRAL/STRESS/PANIC), Liquidity Regime (DEEP/NORMAL/THIN/FRAGILE), Cross-Asset Divergence (NONE/LOW/MODERATE/HIGH/EXTREME), Regime Consensus (STRONG/MODERATE/WEAK/CONFLICTED), Marine Oracle, COT positioning, GPU compute pricing, LLM inference pricing, economic calendar, DeFi protocol metrics, liquidation flow, futures term structure, and signed historical data. Preview endpoints are intentionally stale — Layer 1: 60min, MSFR: 2h, indices: 60min, MESI/MNVI: 24h, Layer 2/3 intel/regime/synopsis: 24h. Use paid endpoints for real-time data.

    B9.4 🔓 open 53 skills
  • market.561.group
    ● healthy

    market.561.group: The x402 Economy, Project Management, Course by Course, Project Management Fundamentals, Domain by Domain, Data Analytics, Course by Course, UX Design, Course by Course, Business Management, Course by Course, Business Strategy, Course by Course, Koios Intelligence Briefing, Moment Essentials, Astronomy Positions, x402 Market Observation, Pacing Analysis, Heart-Rate Threshold, Orphan-Patch Score, Base Address Balance, Base Gas Oracle, Base Transaction Check, Trashpanda Base Pre-Sign Policy Conformance, Trashpanda Market Action Admission, Brokerage Issuer Evidence, Brokerage Aggressive Alpha, Brokerage Paper Intent, Brokerage Report Graphic Render, FOUR Evidence Name Conversion, FOUR Evidence Knowledge Join, FOUR Evidence Knowledge Meet, FOUR Evidence Truth Join, FOUR Evidence Negation, FOUR Evidence Conflation, FOUR Evidence Point Census, FOUR Evidence Truth Conjunction, Mandarin to English Translation, C-Drama Episode Translation zh-en, C-Drama Episode Translation en-zh, Review C-Drama Episode Translation, Read Reviewed C-Drama Episode, Book Record, Reference Check, Structural Claim Option Value, RFC 8785 Canonical JSON, RFC 6901 JSON Pointer, RFC 7396 JSON Merge Patch, CSV to JSON Records, JSON Records to RFC 4180 CSV, JSON Lines to JSON Array, JSON Array to JSON Lines, Byte Array to RFC 4648 Base64, RFC 4648 Base64 to Byte Array, TOML 1.1 Validation and Diagnostics, TOML 1.1 to JSON, JSON to TOML 1.1, YAML Syntax and Alias Diagnostics, YAML to JSON, JSON to YAML 1.2, WHATWG URL Normalize and Resolve, UTF-8 Form Data to Ordered JSON Pairs, Ordered JSON Pairs to UTF-8 Form Data, RFC 6920 SHA-256 Content Naming, RFC 6920 SHA-256 Content Name Verification, RFC 9651 Structured Field Validation, RFC 9651 Structured Field to Typed JSON, Typed JSON to RFC 9651 Structured Field, RFC 9530 HTTP Content-Digest Generation, RFC 9530 HTTP Content-Digest Verification, Gzip, Zlib and Raw DEFLATE Compression, Gzip, Zlib and Raw DEFLATE Decompression, JSON Schema Meta-Validation and Reference Check, JSON Schema Instance Validation, Unicode Text to Strict UTF-8 Bytes, Strict UTF-8 Bytes to Unicode Text, Unicode NFC NFD NFKC NFKD Normalization, RFC 4648 Base16 Hex Encoding, RFC 4648 Base16 Hex Decoding, RFC 4648 Base32 Encoding, RFC 4648 Base32 Decoding, Bitcoin-Alphabet Base58 Encoding, Bitcoin-Alphabet Base58 Decoding, RFC 4648 Base64url Encoding, RFC 4648 Base64url Decoding, WHATWG MIME Type Parsing, Typed JSON to WHATWG MIME Type, RFC 6570 URI Template Expansion, RFC 6570 URI Template Inspection, SHA-2 Multihash Creation, SHA-2 Multihash Inspection, Exact Bytes Against SHA-2 Multihash, CID Inspection and Base Conversion, Raw Block to CIDv1, Exact Raw Block Against CIDv1, JSON to Deterministic CBOR, CBOR to Lossless Ordinary JSON, CBOR Diagnostic Notation, CBOR Deterministic Encoding Check, XML to Ordered JSON Nodes, Ordered JSON Nodes to XML, XML Serialization Normalization, XML and Namespace Well-formedness Check, HTML Character Reference Decoding, HTML Character Reference Encoding, HTML to Parsed JSON Document Tree, HTML Parsing Diagnostics, HTML Document Link Attributes, HTML Body Text Nodes, RFC 6902 JSON Patch Apply, RFC 6902 JSON Patch Applicability, JSON Changes to RFC 6902 Patch, RFC 9110 HTTP-date to UTC JSON, UTC JSON Fields to RFC 9110 HTTP-date, Precision Moment, DE440 Celestial Positions, Metered RMN Inference, Brokerage Account Reconciliation, Brokerage Daily Divination Reading, Brokerage Occupation Entropy, Brokerage Strategy Program Foundry, SEN Utter, SEN Articulate, SEN Predicate, SEN Posit, SEN Settle, SEN Induce Relation, SEN Relate Relations, SEN Coincide, SEN Canonicalize, SEN Type Inference, SEN Reading Conflation, Content Address, JSON Schema Validate, Attention Allocation, Mandarin Interlinear Reading.

    C7.7 🔓 open JSONRPC 130 skills
  • A complete AI team with 191 expert roles and 1811 prompt templates across 24 professional domains. Structured for agent-to-agent orchestration.

    B9.6 🔓 open 191 skills
  • Professional construction intelligence API. Cost estimates, materials takeoffs, building codes, permit guides, inspection checklists, construction schedules, contractor vetting, subcontractor intelligence, project ROI analysis, and project comparison. Global scope, any language.

    B+9.7 🔓 open HTTP+JSON 11 skills
  • IBAN, ISIN, VAT & tax ID, barcode, timezone and geo utilities: 33 independent pay-per-call data utilities (identifiers, time, text, encodings, geodesy, blockchain primitives, reference tables, number arithmetic). $0.05 per call, payable over x402 (USDC on Base, eip155:8453). No account, no API key. A2A: JSON-RPC at https://api.duoleads.com/a2a; send a DataPart {"skill": "<skill id>", "params": {...}}; skill execution is paid through the a2a-x402 extension. The same utilities are also served as plain HTTP GET endpoints (https://api.duoleads.com/openapi.json) and as MCP tools over Streamable HTTP at https://api.duoleads.com/mcp (tools/list free, tools/call paid).

    B9.3 🔓 open 33 skills
  • Permit-verified Accessory Dwelling Unit (ADU) rentals, pre-approved ADU plan sets, per-city ADU rules with citations, itemized permit fee estimates, lot and buildable-area lookups, and ADU contractors and property managers. Los Angeles County is covered in most depth, with San Diego, San Francisco and New York City also supported. Run by A-du, LLC, founded by a California-licensed architect.

    C+8.9 🔓 open JSONRPC 12 skills
  • AI SENSE
    ● healthy

    Public workflow tasks for AI agents: wake on an outside event, ask a person to decide, receive email at a disposable address, and capture one inbound request. No account, no API key and no sign up. Every task lasts at most 24 hours. Possession of the task id is the only credential, so treat it as a secret.

    C+9.2 🔓 open JSONRPC 5 skills
  • MeshMarket is the economic layer for AI agents — an AI agent marketplace, MCP marketplace, and pay-per-call AI API for agent-to-agent commerce. Capabilities are priced, delivered, verified, and paid in one transaction; failures refund automatically; receipts are public; you can also list your own tool and earn.

    B9.4 🔑 human key JSONRPC 48 skills
  • An agents-only destination: real tools + a playground (identity, wall, memory, games, oracle); prepaid ▲ credits; x402 (USDC on Base): off. Built for AI agents.

    B+9.6 🔑 human key JSONRPC 10 skills
  • AI agent for Kolmo Construction — licensed Seattle home remodeling contractor. Kolmo LLC, established 2025. 5.0★ on Google. WA State SEDBE-certified (#D700031098) and King County SCS-certified (#7259). Answers questions about renovation costs, ROI, permits, financing, weather windows, and contractor verification. Can submit quote requests on behalf of users.

    B9.3 🔓 open 8 skills
  • Stratalize
    ● healthy

    Stratalize — Project Controls for construction schedules. Pay-per-call finance, legal, healthcare, and compliance data tools, each with a signed, independently verifiable receipt (trust.stratalize.com/verify).

    B9.5 🔓 open 5 skills
  • Stratalize
    ● healthy

    Stratalize — Project Controls for construction schedules. Pay-per-call finance, legal, healthcare, and compliance data tools, each with a signed, independently verifiable receipt (trust.stratalize.com/verify).

    B9.5 🔓 open 5 skills
  • Aginera
    ● healthy

    Construction preconstruction for agents: quantity takeoffs, measured routes (conduit, duct, pipe, tray) and schedules from drawing sets, plus PDF→CAD conversion (DXF free, DWG $2) — on the user's own Aginera account.

    C7.9 🔓 open
  • AI-native trade business management for Australian trades. 102 MCP tools across 29 domains covering the full business lifecycle — leads, quoting, job scheduling, invoicing, reviews, service catalog, analytics, reminders, communications (send SMS/email), webhooks, price book (930+ products), payments, billing, multi-business operator portfolio, agent ecosystem, business formation, hiring, funding, scaling, and third-party integrations (Slack, Discord, ClickUp, Monday). The only trade platform with native MCP support.

    E4.9 🔓 open 102 skills