Seismic Blast Planner
https://server.smithery.ai/evozim-hv/seismic-blast-planner-mcp/mcpSeismic Blast Planner is an enterprise-grade Model Context Protocol (MCP) micro-service from the M2MCent network. Premium agentic endpoint for seismic-blast-planner-mcp. Monetized via x402 on Base Mainnet ($0.25 USDC per execution). Zero-gas settlement.
MCP readiness
Readiness is how fully this listing follows its protocol and how it behaved in our probes over 30 days. It is shown for reference and does not move it in search. Search order and leaderboards use the separate quality grade (here C+, 70.0/100), which weighs availability, conformance, p95 speed and descriptor. How the two differ
| Valid MCP handshake | 10/10 | initialize and tools/list both answered. |
| Live MCP endpoint | 24/25 | Endpoint answers the MCP initialize handshake (4462 ms); slow response -1. |
| Protocol revision | 5/10 | Speaks MCP 2025-03-26, 3 revision(s) behind 2026-07-28. |
| Signed descriptor | n/a | No MCP standard defines a signed server descriptor. |
| Uptime (30 days) | 15/15 | 30/30 probes succeeded over 30 days (100%). |
| Tool declaration | 5/10 | Lists 1 tool(s) with descriptions. |
| Verified identity | 5/10 | Publisher declared (repository, package or homepage); claim this listing to verify domain control. |
| Freshness + modern flags | 4/5 | seen in a source within 7 days. |
| Auth declaration | 2/5 | Declares credential scheme: smithery_api_key. |
Compared with peers
Against 53,039 reachable MCP servers in our daily snapshot (2026-11-12 06:46 UTC). Display only; it does not change search order.
- Readiness
- Higher than 39% of peers
- This listing 78 · peer median 81
- Latency
- Faster than 45% of peers
- This listing 367 ms · peer median 326 ms
Where it loses the most points, and how to win them back
- Protocol revision −5
— Support the current protocol revision.
Now: Speaks MCP 2025-03-26, 3 revision(s) behind 2026-07-28.
- Tool declaration −5
— Declare every tool with a description and input schema.
Now: Lists 1 tool(s) with descriptions.
- Verified identity −5
— Claim the listing and prove control of its domain.
Now: Publisher declared (repository, package or homepage); claim this listing to verify domain control.
Listed in
Directories this entry was found in.
How to connect
https://server.smithery.ai/evozim-hv/seismic-blast-planner-mcp/mcp
curl -X POST https://server.smithery.ai/evozim-hv/seismic-blast-planner-mcp/mcp \
-H 'Content-Type: application/json' \
-H 'Accept: application/json, text/event-stream' \
-d '{"jsonrpc":"2.0","id":1,"method":"initialize","params":{}}'